Watch This Space…

October 26, 2007 by pilambdaphi

Just a couple of quick updates as I try to get together with my photographer (Chris Kessler, SAS ‘01) to document the House once again.

Since the last post, the house has continued to undergo some more changes. Most notably, the front stair tower has been removed and the front facade has been cleaned, revealing beautiful stonework that has not been be appreciated in some time. Also, a bar has been built in the basement and some more furnishing have been purchased for the brothers.

Expect new photos within the next week or so (hopefully sooner).

Settling In

March 1, 2007 by pilambdaphi

The Brothers moved into their newly renovated house over the first weekend of December 2006. Quickly thereafter, Happy Hours were again a regular Thursday occurrence and bands began gracing the living room with their presence. Though very happy with their newly purchased bedroom furniture, the Brothers had to make due with only the very basics throughout the rest of the house. Slowly but surely, more amenities are starting to appear in the House common areas. These pictures were taken on February 28, 2007:

Stage  Sound Equipment  Candlelight

Pool Room  Kitchen  Dining Room

Bathroom  Bedroom  Hallways

House Dedication

December 28, 2006 by pilambdaphi

During Penn’s 2006 Homecoming weekend, we held a reception in the nearly finished house where we honored those who were generous enough to donate money towards our renovation and refurnishing efforts. Food was consumed, drinks were imbibed, foosball was played, and brothers were reconnected during this emotional event. Though the house was still one month from being occupied, the Alumni who attended were very happy to see the progress made and reminisce about old times. The following pictures were taken at this event on October 28, 2006:

 

Setup Cocktails Alumni Tour

Foosball Mingling Speeches

Crowd TOAST!

 

Finishings

October 20, 2006 by pilambdaphi

Though we have again experienced some minor delays, the work is progressing. Sheet rock and joint compound are complete and we are looking to begin putting the finishing touches on the house. These pictures were taken in late September 2006:

Finished Plumbing Living Room Stairs 

Four Corners Window Moldings

Sheet Rock!

September 7, 2006 by pilambdaphi

Another two weeks has gone by and even more progress has been made. The brothers are back on campus and have been temporarily moved to Hill House until 3914 Spruce is finished and the proper inspections are complete. We are hoping this will be about a month. The house is really starting to look like a living space and not just a construction site. At this point, everyone is eager to see a finished project. And now, the pictures (taken August 28, 2006):

Drywall Electric & Cable Wiring Bathroom

Sound Insulation What A View...

The End Is In Sight

August 20, 2006 by pilambdaphi

So much has been completed in the past 28 days. The new staircase is complete, new windows are in, HVAC ductwork is all but complete, bathroom plumbing is roughed in, telecommunications wiring is going in, and insulation is being laid. I could go on, but I will let the pictures speak for themselves (taken August 13, 2006):

Historic Designation New Windows HVAC Ductwork HVAC Units Insulating Against the Elements Bathroom Plumbing Closing Up

Stairs

August 20, 2006 by pilambdaphi

A week and a half has gone by since the last post and in that time framing on the 4th/3rd/2nd floors and the stairs to the 4th floor (Heavens) have been completed. Also, we see the first rise of stairs for the new staircase in the center of the house. These pictures were taken on July 18, 2006:

New Staircase Stairway to Heaven(s)

Looking Down from the Heavens Heaven South

Rough-In

August 20, 2006 by pilambdaphi

We were able to document more progress on July 6, 2006. Four more workers have been added to the efforts to ensure we are on track for September 1st completion. Framing is complete on the 3rd floor and commencing nicely in all other areas. The 2nd/3rd floor electrical rough-in has started and new treads/landings have been added to the rear stairtower.

Breaker Box ElectricalPlans Spool of Wire

Electrical Rough-In New Firetower Stairs

Frame-Up

June 22, 2006 by pilambdaphi

By June of 2006 all structural issues have been addressed. The electicial, plumbing, and mechanical contractors have been chomping at the bit to get started and are poisted to let loose on the house. These pictures were taken on June 13, 2006 and as we can see, framing has begin in all areas of the house.

Basement Uncovered  All work and no play…  Taking Shape

Deliveries Abound  Good Riddance

Progressing…

June 22, 2006 by pilambdaphi

The first three months of 2006 were more difficult that expected with labor issues and a few work stoppages, but the project is back on track. Here are some pictures from March 26, 2006 showing the progress that has been made:

New 3rd Floor View  Living Room -> Kitchen  Dining Room Toast

Joist Damage   Awaiting the New Stairs